Hans van der Valk starts in the company of father Bernard. B.P. van der Valk Greenhouse Construction in Naaldwijk. Hans loved inventing new ways, to make heavy work lighter and easier. It all started with the greenhouse ventilation machanisme...
A trip down memory lane
Trip down memory line
1963
1975
Introduction of movable screen systems.
1999
Introduction of the KliMax slip system.
2002
Introduction of the StabiMax ventilation mechanism.
2003
Construction of hypermodern push rod machine.
2006
Commissioning of the newly bult halls 5 to 9.
2008
Introduction of ValkScreenVision.
2009
Start of Van der Valk Solar Systems.
2010
Development of field systems.
2012
Development of flat roof systems.
2013
Development of pitched roof systems.
2014
Introduction of GreenTop outdoor screen system.
2015
Introduction of substructure terrace systems.
2015
Opening office in United Kingdom.
2020
Opening offices in Sweden, Spain and Den Hoorn (the Netherlands).
2023
New build of halls 10 to 12.